Continuing Engineering Services – Orange County Florida Utilities
Continuing Engineering Services – Orange County Utilities, Florida
BFA has been providing continuing consulting engineering services to the Orange County Utilities Department since 2001. BFA was reselected for a fourth time in 2011. The following are some representative projects:
- CR 535 Water Supply Wells – Design and well construction services for two 1,800 GPM wells and one 1,000 GPM to supply the CR 535 Water Treatment Facility.
- South Water Reclamation Facility Influent Pump Station and Pretreatment Facilities Rehabilitation – Design and construction services for rehabilitation of the influent pump station, pretreatment structure, aeration basins, and 54-inch influent mains at the 43 MGD South Water Reclamation Facility.
- South Water Reclamation Facility Supplemental Air System – Study to evaluate and recommend improvements to the aeration system at the southeast basins at the 43 MGD South Water Reclamation Facility.
- Golfway Blvd. Force Main Replacement – Design and construction services to for 5,100 feet of 12-inch force main by directional drill.
- B. McLeod Transfer Station Leachate Collection and Pumping System – Upgrade and replacement of the leachate pumping and piping systems for this solid waste transfer station.
- Conway Hills Water Distribution System Improvements – Design and construction services for 15,900 feet of water main and 3,700 feet of 12-inch force main.
- Harbor East Pump Station and Force Main – Design and construction services for a new triplex 30 Hp wastewater pumping station including odor control and standby generator, 13,400 feet of 12-inch force main and 1,000 feet of 8-inch and 10-inch sewer.
- Riverside Acres Water Distribution System Improvements – Design and construction services for 16,500 feet of water main replacement.
- Constructability Review for the Phase 2B expansion of the Eastern Regional Water Supply Facility Expansion
- Cypress Springs Wastewater Pump Station Replacement and Force Main Improvements – Design and construction services for rehabilitation of a duplex 20 Hp 660 GPM wastewater pumping station and 2,500 feet of 12-inch force main.
- Groves Mobile Home Park Wastewater Force Main – Design and construction services for manhole rehabilitation and 1,400 feet of 6-inch force main.
- Ginn Master Pump Station (Master Pump Station F3067) – Design and construction services for a new triplex 1,700 GPM wastewater pumping station including odor control and standby generator
- Holden Heights Phase 3 STAG Assistance – Administration of a $450,000 STAG grant for the Holden Heights wastewater system improvements.
- Lake Lawn Gravity Sewer Rehabilitation – Design and construction services for evaluation and rehabilitation of 9,500 feet of sewer within an existing subdivision.
- Long Lake/Lake Shores/Wekiva Manor Water Distribution System Improvements – Design and construction services for 9,700 feet of water main replacement.
- Windermere Area Wastewater Service Study – Study to determine the improvements and cost to retrofit approximately 1,200 existing homes and businesses on septic tank to central sewer.
- Tangled Oaks Reclaimed Water Main – Design and construction services for 1,000 feet of 12-inch reclaimed water main.
- Hastings St./Powers Dr./West SR 50 Area Wastewater Service Study – Study to determine the improvements and cost to retrofit existing homes and businesses on septic tank to central sewer.
- Daetwyler Shores Water Main – Design and construction services for replacement of 1,000 feet of 8-inch water main.
- Clearview Heights and Westmont Subdivisions Water Distribution Improvements – Design and construction services for 16,200 feet of water main replacement.
- Summerlake Water Booster Pump Station – Design and construction services for a 4,500 GPM water booster pumping station to address peak demands and fire flows in the County’s Southeast Service Area.
- NW Water Reclamation Facility Administration Building Masonry Coating System – Evaluate existing failing coating system on the administration building and provide design and construction services for the recoating.
- Kirby Smith Road Reclaimed Water Main – Design and construction services for 4,300 feet of 12-inch reclaimed water main.
- Sand Lake Road Wastewater Utilities Relocation – Design and construction services for replacement of 4,000 feet of 30-inch wastewater force main due to conflicts with the road widening.
Continuing Engineering Services – Orange County Utilities, Florida
BFA has been providing continuing consulting engineering services to the Orange County Utilities Department since 2001. BFA was reselected for a fourth time in 2011. The following are some representative projects:
- CR 535 Water Supply Wells – Design and well construction services for two 1,800 GPM wells and one 1,000 GPM to supply the CR 535 Water Treatment Facility.
- South Water Reclamation Facility Influent Pump Station and Pretreatment Facilities Rehabilitation – Design and construction services for rehabilitation of the influent pump station, pretreatment structure, aeration basins, and 54-inch influent mains at the 43 MGD South Water Reclamation Facility.
- South Water Reclamation Facility Supplemental Air System – Study to evaluate and recommend improvements to the aeration system at the southeast basins at the 43 MGD South Water Reclamation Facility.
- Golfway Blvd. Force Main Replacement – Design and construction services to for 5,100 feet of 12-inch force main by directional drill.
- B. McLeod Transfer Station Leachate Collection and Pumping System – Upgrade and replacement of the leachate pumping and piping systems for this solid waste transfer station.
- Conway Hills Water Distribution System Improvements – Design and construction services for 15,900 feet of water main and 3,700 feet of 12-inch force main.
- Harbor East Pump Station and Force Main – Design and construction services for a new triplex 30 Hp wastewater pumping station including odor control and standby generator, 13,400 feet of 12-inch force main and 1,000 feet of 8-inch and 10-inch sewer.
- Riverside Acres Water Distribution System Improvements – Design and construction services for 16,500 feet of water main replacement.
- Constructability Review for the Phase 2B expansion of the Eastern Regional Water Supply Facility Expansion
- Cypress Springs Wastewater Pump Station Replacement and Force Main Improvements – Design and construction services for rehabilitation of a duplex 20 Hp 660 GPM wastewater pumping station and 2,500 feet of 12-inch force main.
- Groves Mobile Home Park Wastewater Force Main – Design and construction services for manhole rehabilitation and 1,400 feet of 6-inch force main.
- Ginn Master Pump Station (Master Pump Station F3067) – Design and construction services for a new triplex 1,700 GPM wastewater pumping station including odor control and standby generator
- Holden Heights Phase 3 STAG Assistance – Administration of a $450,000 STAG grant for the Holden Heights wastewater system improvements.
- Lake Lawn Gravity Sewer Rehabilitation – Design and construction services for evaluation and rehabilitation of 9,500 feet of sewer within an existing subdivision.
- Long Lake/Lake Shores/Wekiva Manor Water Distribution System Improvements – Design and construction services for 9,700 feet of water main replacement.
- Windermere Area Wastewater Service Study – Study to determine the improvements and cost to retrofit approximately 1,200 existing homes and businesses on septic tank to central sewer.
- Tangled Oaks Reclaimed Water Main – Design and construction services for 1,000 feet of 12-inch reclaimed water main.
- Hastings St./Powers Dr./West SR 50 Area Wastewater Service Study – Study to determine the improvements and cost to retrofit existing homes and businesses on septic tank to central sewer.
- Daetwyler Shores Water Main – Design and construction services for replacement of 1,000 feet of 8-inch water main.
- Clearview Heights and Westmont Subdivisions Water Distribution Improvements – Design and construction services for 16,200 feet of water main replacement.
- Summerlake Water Booster Pump Station – Design and construction services for a 4,500 GPM water booster pumping station to address peak demands and fire flows in the County’s Southeast Service Area.
- NW Water Reclamation Facility Administration Building Masonry Coating System – Evaluate existing failing coating system on the administration building and provide design and construction services for the recoating.
- Kirby Smith Road Reclaimed Water Main – Design and construction services for 4,300 feet of 12-inch reclaimed water main.
- Sand Lake Road Wastewater Utilities Relocation – Design and construction services for replacement of 4,000 feet of 30-inch wastewater force main due to conflicts with the road widening.